A major healthcare re-roofing project delivered with precision, sensitivity, and technical excellence.
Complete Roofing Systems (CRS) was appointed by Integrated Health Projects (IHP) — the joint venture between VINCI Construction UK and Sir Robert McAlpine — to deliver the full roofing and wall‑cladding package for the RAAC roof replacement at Blackpool Victoria Hospital.
This safety‑critical project replaced legacy Reinforced Autoclaved Aerated Concrete (RAAC) components with new, robust roofing and façade systems designed for long‑term performance in a demanding hospital environment.